CompSys, Inc
4255 Dow Rd.
Melbourne, Florida 32903
321-255-0399

Installation Cost Comparison Calculator

Please fill in all assumption values, labor task minutes and material consumption in lbs.

Assumptions

Gel Coat Cost $/lb
Resin Cost $/lb
Chop Cost (glass + resin) $/lb
Methacrylate Adhesive $/lb
Fiberglass Cost Grid $/lb
Fiberglass Cost Tabbing $/lb
Flotation grade Foam $/lb
Freight/PRISMA Boat Set $/set
Labor Rate $/hr

Conventional Grid

Task Material Consumption (lb) Labor (Min.) Labor $$ Material $$
Mold maintenance/mold prep  
0.00
 
Sand Blast Stringers
0.00
0.00
Chop Cost (ex scrap)
0.00
0.00
Fiberglass for grid (ex scrap)    
0.00
Transport Stringers  
0.00
 
Trim and Grind  
0.00
 
Install/Bond and Level  
0.00
 
Trim Scrap    
0.00
Methacrylate Adhesive    
0.00
Cure Time for Methacrilite  
0.00
 
Fiberglass Cost for Tabbing    
0.00
Resin Cost for Tabbing    
0.00
Cure Time for Tabbing  
0.00
 
Drill Holes for Foam Injection  
0.00
 
Foam Grid  
0.00
 
Foam Consumed    
0.00
Grid Mold Amortization      
Total cost Labor and Materials
Note: Costs do not include initial mold cost!
0.00

Compsys Stringer

Task Material Consumption (lb) Labor (Min.) Labor $$ Material $$
PRISMA Boat Set        
Freight        
Installation in Boat        
Resin for wet out
0.00
0.00
Resin for Tabbing
0.00
0.00
Labor $      
Total cost labor and materials
0.00